Real-world engineering excellence. Proven results across Kenya.
Mother of Mercy Hospital • Gidel, Nuba Mountains
Hospital in remote South Sudan required 99.99% uptime for operating theaters, ICU, and life support systems. Existing generator had 12-second transfer time causing critical equipment shutdowns during grid failures. Remote location demanded exceptional reliability.
Installed redundant 1000kVA + 750kVA Cummins generators with N+1 configuration. DeepSea DSE8610 MKII synchronization control with load-sharing. 10-second parallel operation before mains disconnect. Added 200kVA UPS for seamless transfer (<4ms switchover).
1750kVA total (N+1 redundancy)
42 days including civil works, acoustic enclosures, fuel system (10,000L underground tanks)
7 days including load bank testing, synchronization tuning, staff training
EmersonEIMS delivered a solution that exceeded our expectations. The seamless integration of generators, UPS, and controls ensured our patients never experience power disruptions. Their 24/7 support and predictive maintenance have been invaluable.
Hospital Administrator
Director of Facilities, Mother of Mercy Hospital
Lenchada Group of Hotels • Multiple Locations, Kenya
Hotel group faced high electricity bills (avg 180,000 kWh/month). Frequent grid outages (10-15/month) disrupted guest services. Management wanted 50% renewable energy by 2025 per sustainability goals.
Installed 250kWp rooftop solar + 500kVA generator + 400kWh Li-ion battery storage. Smart energy management system (EMS) with load prioritization. Solar covers 60% daytime load, batteries handle evening peak, generator as backup.
250kWp solar, 500kVA generator, 400kWh storage
28 days (rooftop structural assessment, panel installation, electrical integration, EMS programming)
5 days including grid-tie approval from KPLC, load testing, staff training
The hybrid system from EmersonEIMS transformed our energy profile. We are saving significantly while meeting our sustainability commitments. The smart EMS ensures guests never notice when we switch between solar, battery, and generator.
Hotel Management
General Manager, Lenchada Group of Hotels
Kenya Seed Company • Kitale, Trans Nzoia County
Seed cold storage requires constant 4°C±1°C. Grid power in Kitale unstable (20-30 outages/month). Previous generator took 15 seconds to start, causing temperature spikes to 8°C, degrading seed viability. Lost KES 8M in spoiled seeds in 2023.
Installed 200kVA Perkins generator with instant-start capability (<2 seconds). Added 50kVA UPS for seamless cold storage transfer. Implemented EmersonEIMS remote monitoring with SMS alerts for temp deviations. Preventive maintenance contract with 4-hour response SLA.
200kVA (165kW continuous), 50kVA UPS
14 days (generator installation, UPS integration, sensor calibration, cloud setup)
3 days (load testing, temperature simulation, alert testing)
EmersonEIMS saved our business. The instant-start generator and UPS system eliminated seed losses. Their remote monitoring gives us peace of mind - we get SMS alerts before issues become critical. Best investment we have made.
Peter Wanyama
Operations Manager, Kenya Seed Company