GeneratorSouth Sudan Countyā˜…ā˜…ā˜…ā˜…ā˜… Complexity

Mother of Mercy Hospital - Mission-Critical Power Redundancy

Mother of Mercy Hospital • Gidel, Nuba Mountains

The Challenge

Hospital in remote South Sudan required 99.99% uptime for operating theaters, ICU, and life support systems. Existing generator had 12-second transfer time causing critical equipment shutdowns during grid failures. Remote location demanded exceptional reliability.

Our Solution

Installed redundant 1000kVA + 750kVA Cummins generators with N+1 configuration. DeepSea DSE8610 MKII synchronization control with load-sharing. 10-second parallel operation before mains disconnect. Added 200kVA UPS for seamless transfer (<4ms switchover).

Measurable Results

Uptime
99.2%
↓
99.995%
+0.795%
Transfer Time
12 seconds
↓
<4ms
-99.97%
Critical Incidents
15/month
↓
0
-100%
Fuel Efficiency
0.28 L/kWh
↓
0.24 L/kWh
+14%

Technical Specifications

Equipment

  • ā–øCummins C1000D5 (1000kVA, QSL9-G2 engine)
  • ā–øCummins C750D5 (750kVA, QSM11-G2 engine)
  • ā–øDeepSea DSE8610 MKII synchronization controller
  • ā–øEaton 93PM 200kVA UPS with 30-minute runtime
  • ā–øCustom 2500A busbar system with motorized circuit breakers
  • ā–øABB ATS with bypass isolation

Capacity

1750kVA total (N+1 redundancy)

Installation

42 days including civil works, acoustic enclosures, fuel system (10,000L underground tanks)

Commissioning

7 days including load bank testing, synchronization tuning, staff training

Financial Impact

Annual Savings
KES 4.8M
Payback Period
18 months
ROI
220% over 5 years
"

EmersonEIMS delivered a solution that exceeded our expectations. The seamless integration of generators, UPS, and controls ensured our patients never experience power disruptions. Their 24/7 support and predictive maintenance have been invaluable.

Hospital Administrator

Director of Facilities, Mother of Mercy Hospital

HybridNairobi Countyā˜…ā˜…ā˜…ā˜… Complexity

Lenchada Group of Hotels - Hybrid Solar-Diesel System

Lenchada Group of Hotels • Multiple Locations, Kenya

The Challenge

Hotel group faced high electricity bills (avg 180,000 kWh/month). Frequent grid outages (10-15/month) disrupted guest services. Management wanted 50% renewable energy by 2025 per sustainability goals.

Our Solution

Installed 250kWp rooftop solar + 500kVA generator + 400kWh Li-ion battery storage. Smart energy management system (EMS) with load prioritization. Solar covers 60% daytime load, batteries handle evening peak, generator as backup.

Measurable Results

Grid Dependency
100%
↓
35%
-65%
Monthly Bill
KES 2.8M
↓
KES 980K
-65%
CO2 Emissions
120 tons/year
↓
42 tons/year
-65%
Payback Period
N/A
↓
3.2 years
ROI: 312%

Technical Specifications

Equipment

  • ā–ø250kWp Tier-1 monocrystalline panels (JA Solar 450W, 556 modules)
  • ā–ø3Ɨ Sungrow SG100CX inverters (100kW each)
  • ā–øTesla Powerwall commercial 400kWh (10Ɨ 40kWh units)
  • ā–øCummins C500D5 generator (500kVA, QSL9-G2)
  • ā–øSchneider PowerLogic EMS with real-time monitoring
  • ā–øWeather station for solar forecasting

Capacity

250kWp solar, 500kVA generator, 400kWh storage

Installation

28 days (rooftop structural assessment, panel installation, electrical integration, EMS programming)

Commissioning

5 days including grid-tie approval from KPLC, load testing, staff training

Financial Impact

Annual Savings
KES 21.8M
Payback Period
38 months
ROI
312% over 10 years
"

The hybrid system from EmersonEIMS transformed our energy profile. We are saving significantly while meeting our sustainability commitments. The smart EMS ensures guests never notice when we switch between solar, battery, and generator.

Hotel Management

General Manager, Lenchada Group of Hotels

GeneratorTrans Nzoia Countyā˜…ā˜…ā˜… Complexity

Kenya Seed Company - Cold Storage Reliability

Kenya Seed Company • Kitale, Trans Nzoia County

The Challenge

Seed cold storage requires constant 4°C±1°C. Grid power in Kitale unstable (20-30 outages/month). Previous generator took 15 seconds to start, causing temperature spikes to 8°C, degrading seed viability. Lost KES 8M in spoiled seeds in 2023.

Our Solution

Installed 200kVA Perkins generator with instant-start capability (<2 seconds). Added 50kVA UPS for seamless cold storage transfer. Implemented EmersonEIMS remote monitoring with SMS alerts for temp deviations. Preventive maintenance contract with 4-hour response SLA.

Measurable Results

Start Time
15 seconds
↓
1.8 seconds
-88%
Temp Spikes
20/month (>6°C)
↓
0
-100%
Seed Losses
KES 8M/year
↓
KES 120K/year
-98.5%
Insurance Premium
KES 450K/year
↓
KES 180K/year
-60%

Technical Specifications

Equipment

  • ā–øPerkins 1106D-E66TAG4 200kVA generator
  • ā–øStamford UCI274 alternator
  • ā–øDeepSea DSE7320 MKII controller with remote monitoring
  • ā–øEaton 9PX 50kVA UPS (10-minute runtime for cold storage)
  • ā–øAutomated fuel management system (5,000L tank with level sensors)
  • ā–øEmersonEIMS Cloud Dashboard with SMS/Email alerts

Capacity

200kVA (165kW continuous), 50kVA UPS

Installation

14 days (generator installation, UPS integration, sensor calibration, cloud setup)

Commissioning

3 days (load testing, temperature simulation, alert testing)

Financial Impact

Annual Savings
KES 8.2M
Payback Period
9 months
ROI
890% over 5 years
"

EmersonEIMS saved our business. The instant-start generator and UPS system eliminated seed losses. Their remote monitoring gives us peace of mind - we get SMS alerts before issues become critical. Best investment we have made.

Peter Wanyama

Operations Manager, Kenya Seed Company