Mining operation, Migori County · August 2026
330 kVA VOLTKA Cummins — supplied, delivered and installed
Client: John Muhindi
Wrapped and loaded in our Nairobi warehouse before the run to Migori.
A 330 kVA VOLTKA Cummins set taken from our Nairobi warehouse to a mining site in Migori — supplied, transported, installed and commissioned with its changeover panel.
- Set prepared and wrapped in the Nairobi warehouse, loaded by crane truck for the run to Migori.
- Positioned on site under cover, with the exhaust and cable routes set out before connection.
- VOLTKA changeover panel mounted at the wall and cabled to the set — the part that makes it start on its own when mains fails.
- Four-pole ATS wired through U, V, W and N with the controller commissioned.